• EMAIL:info@sinoeco.com
  • EN RU PT

AMR GPRS Wireless Prepayment Prepaid Gas Meter

AMR GPRS Wireless Prepayment Prepaid Gas Meter

IC Card Prepayment Prepaid Gas Meter, AMR, GPRS Wireless (G1.6, G2.5, G4)

IC Card Prepayment Prepaid Gas Meter, AMR, GPRS Wireless
G1.6, G2.5, G4

Basic functions:
. Computerized management and billing by gas supply companies
. Prepayment of bills with computer technology and IC card to prevent long-term arrears
. When water flow exceeds the maximum flow rate, the built-in valve will be automatically closed
. Effective anti-theft design

Main features:
. It can automatically measure water flow with CPU card or logic card
. LCD (liquid crystal display) and alarm
. The built-in ball valve and the driving motor works reliably and effectively
. Special technology ensures no worry about IC card copy
. Built-in solid data memory records all running data
. Anti-theft designs: Anti-magnetic interruption, power break protections
. Low energy consumption design

Technical data:
. Basic meter: Diaphragm gas meter G1.6, G2.5, G4 in conformity with EN 1359
. Working power: 4 alkali batteries
. Working voltage: DC6V
. Stable working current: Less than 100 uA
. Maximum open circuit voltage: Less than DC6.6V
. Maximum short circuit current: Less than DC1.5A
. IC card write times: 100.000
. Data retaining duration: More than 10 years.

Detailed information

Main technical data:

Dmensions and weight:

 

Please Attention:

1.If you want to get samples and catalogue from us, please contact us at info@sinoeco.com Normally, we need 7-15 days for making samples. and you need to pay for them. However, it would be highly appreciated if you can accept freight collect.
2.We normally need 20-35 days for production,however,please contact us if urgent
3.We ar OEM,ODM supplier,Wesupport FOB,CFR,DIF price term, and often ship from SHANGHAI or NINGBO sea port.
4.We encourage payment term:T/T or irrevocable L/C at sight, or 30% T/T deposit and 70% balance when receipt of advice of shipment.
5.Before installing the meter, we had better make sure that, it has been chosen correctly, check that the nominal diameter, flow rate, working temperature and pressure are compatible with the installation conditions.

Contact


Enquiry